S*** C*** E*** H*** P***

Explore selected opportunities in EV charging infrastructure, energy projects and fuel retail. Many portfolios are managed confidentially, with detailed information shared only with suitable investors.

EVC-2F5BCBC9

S*** C*** E*** H*** P***

A sample of the administration and public presentation for commercial EVC location hosting.

Active
Location
BURSA
Capacity
100+ araçlık Genel otopark

A · Commercial location details

Business type
Restaurant · Shopping centre · Café · Car park · Other · Hospital
Google Maps location link
Open link

B · Location use and traffic

Average parking duration
3–6 hours
Is valet service available?
No
Is the location open 24 hours?
Yes

C · Parking and installation area

Parking structure and indoor / outdoor status
Outdoor parking
Spaces available for EV charging
8
Is public access possible?
Yes
Do you operate the car park?
Yes
Is the parking area owned by the institution or leased?
Leased
Charging area usage
Public charging operation

D · Electrical infrastructure

Is there a transformer?
Yes
Approximate transformer distance (metres)
50
Is there a medium-voltage line?
Unknown
Is there a generator?
Unknown
Has DC fast charging installation previously been considered?
No

Preliminary approval and information sharing

Approval for Elektron to contact relevant charging network operators and conduct a preliminary assessment
Yes

Elektron · Project information

Vehicle traffic assessment
High

Elektron · Technical assessment

Shared operation (CPO)
No

Images and documents

Request confidential information

Let’s build the next connection.

Let’s discuss your project
WhatsApp